Implementing and utilizing the information within the 3D model has a monumental impact on the outcome of the project. With the mixture of highly detailed drawings and the use of our Total Station, we bring the 3D model into the field. This degree of information bridges the gap between idea and reality. Having this level of crystal clear detail has allowed us to prefabricate rack assemblies, pre-order specialized material and increase the installation accuracy, all while decreasing the schedule duration.

Upon the project’s completion, these hybrid drawings are handed off to the owner as an exact road map to the electrical infrastructure. By embracing today’s 3D technology with over 75 years of electrical history, we ensure that what was intended to be constructed is constructed to the highest of quality.

Embracing 3D Technology


To offer our professional evaluation of electrical contracting projects, with respect to application and associated costs, we provide our customers with:

  • Contractors ready to listen and respond to your needs
  • Flexibility required for your modern construction project
  • Technical and “common sense” development
  • “Menu” approach to options
  • Opportunity to review improved applications via potential value engineering alternatives, initiated by Cannon & Wendt, based on our acquired experience
  • Cost containment

What BIM Allows Us to Do


  • Reduce the design/construction duration
  • Reduce the number of errors due to better coordination
  • Make better and faster decisions
  • Increase Productivity
  • Provide higher quality installations