Cannon & Wendt co-located onsite while this project was under construction, coordinating and designing side by side with the general contractor, Architect, Owner, and Specialty Contractors. Project included intimate prefabrication design while working in a collaborative Revit environment.
TypeInstall pathway, cabling and terminations for Building Automation SystemSF300,000 SFLocationSun City, ArizonaDateJuly 2020