Project consisted of a EUP, CUP, three story ED and a 14 story patient tower in the existing campus. Both the normal and emergency power systems of the existing campus were integrated into the new design creating multiple shutdowns and changeovers to create the new environment that will power the campus for years to come.
TypeC&W was located onsite while under construction, coordinating and designing side by side with the general contractor, Architect, Owner, and Specialty Contractors. Project included intimate prefabrication design while working in a collaborative Revit environment.SF17 Stories, 700,000 SFLocationPhoenix, ArizonaDate2019